
Nature Calendar
Pavement Mosaic (2.5m diameter)
Maun Infant School, Ollerton, Nottinghamshire
Materials: ceramic tesserae
This mosaic was constructed in 16 sections. Each section was made
'indirect' - face down onto stretched paper using a temporary
(child friendly!) adhesive. Once complete, the sections were reversed
and fixed in situ to a concrete base using permanent cement based
adhesive. The paper was then peeled back to reveal the face of
the mosaic for the fist time.